Quick trip away, new bike, no more exams and lots on the van!

Cor, busy, eh?

Since I last posted Jake has finished his GCSE exams. He thinks he did OK, and he seemed happy enough after each one, so fingers crossed he’ll have done what he needs to get the grades college are asking for. Time will tell, roll on August 25th!

Meantime, he’s hoping to get some extra hours in at work so he can start saving for his 125cc motorbike when he turns 17 in December.  He’ll be able to use a 125 to get to Lincoln at back (for college) and he much prefers this idea to the bus (personally, I’d rather he used the bus!)

Speaking of bikes, we’ve upgraded Jake’s! His original bike was great but a bit on the slow side to be riding on Lea Road (which is a 40 mph) so we upped it to a slightly nippier one which will allow him to ride WITH the traffic rather than holding it all up. It’s a nice looking thing now that Nik has done a custom sticker job on it!

13427917_10153529864406126_9123282616882581981_n

It’ll do him for work until he can up it to something suitable for his college run.
Nik, being Nik, managed to sell his old one within hours of listing it on eBay. Bonus!

I also had a quick weekend jolly to my sister’s last weekend. That was fun. She’s got herself a new job (after 6 months without one) so we had a bit of a celebration weekend. That and a belated birthday treat of afternoon tea in Folkingham which was lovely.

Yummy Yummy
Yummy Yummy (and yes, that’s my tea WITH milk!)

So, aside from afternoon teas, bikes and exams, about the only thing that’s been happening (aside from work being busy, but you really don’t want to read about that!) is, guess what? The van!

Nik got tons done while I was away last weekend. He made lots of lovely doors for overhead lockers and kitchen units; routing them with super curvy edges and knock-on trim.

Routing roundy corners
Routing roundy corners
Routing grooves for knock-on trim
Routing grooves for knock-on trim
Knocking in trim
Knocking in trim
Vinyl-covered door-y goodness
Vinyl-covered door-y goodness
The under-oven cupboard and the drawer above the fridge (as well as the fridge door itself) will all be covered/re-covered with silver. We're not liking the black vinyl here.
The under-oven cupboard and the drawer above the fridge (as well as the fridge door itself) will all be covered/re-covered with silver. We’re not liking the black vinyl here.

The fridge electrics were finished (12v and 240v) and the gas lines were fitted properly so we could, when we’re feeling brave enough, actually put some gas in the tank and try them all out.

Like I said, when we’re feeling brave enough!

Fridge connected to 12v, 240v and gas!
Fridge connected to 12v, 240v and gas!

There’s a slide out shelf, above the fridge, which can be removed (along with the drawer) for fridge maintenance.

Slidey outy shelfy thingie
Slidey outy shelfy thingie
Slidey outy drawer thingie
Slidey outy drawer thingie

While I was away (Nik gets a lot done when I’m not about because he has no one getting in his way. Apparently, at times it is like trying to “do plumbing with an orangutan”! His exact words which he is NOT allowed to forget he said!), Nik also sussed out fitting our kitchen taps which were proving to be a bit of a challenge because our worktop was deeper than the stem.

Oops. That's not gonna work!
Oops. That’s not gonna work!
Template time
Template time
More routing to make space underneath for the tightening nuts
More routing to make space underneath for the tightening nuts
Ta-da! Isn't he a clever sort?
Ta-da! Isn’t he a clever sort?

13435575_10153709936603526_1621095985584564556_n

Since coming back from my sister’s, we’ve not spent much time in the van until yesterday (Friday).

I did manage to paint the inside of the wardrobe walls though during the afternoons. We’ve just used a satin paint to take the wood edge off it and make it a bit lighter, brighter and more inviting for storage  – because, you know, storage needs to feel welcome!

First panel (the wardrobe/bathroom wall) was painted out of the van...
First panel (the wardrobe/bathroom wall) was painted out of the van…
... the second (wardrobe/bed) panel was done in the van. A much splatterier job!
… the second (wardrobe/bed) panel was done in the van. A much splatterier job!

While I was painting outside, Nik was tidying up electrics inside. It’s al much neater in the overhead locker “control panel” section now and, apart from the kitchen light which still has to be wired up to the switch, almost done and ready for trimming and fitting.

Additionally, he finished felt-lining the overhead lockers fully (I cut all the felts to size while Nik was in the van, and he glued it all in)

Felt-lined lockers and an almost-finished control panel
Felt-lined lockers and an almost-finished control panel

I also became re-acquainted with my sewing machine! We have 3 sets of curtains to hang and they all need modifying in some way or another.

Curtain cut in half and pinned ready for sewing
Curtain cut in half and pinned ready for sewing
Been a while since I've used this old girl
Been a while since I’ve used this old girl

Firstly, The ones for the rear doors. The 2 rear windows were going to use one pair of curtains: one curtain on each door, but we discovered that it wasn’t possible to open them fully to one side because a full curtain width took up too much space across the small window still. So, I halved each single curtain and hemmed the insides. The look pretty good now and will hopefully open better each side of the windows. We just have rails to make for the back doors first (we only have one “demo rail” at present)

Then, we figured out what sort of pole to use for the main living area window and test hung those. The length will be adjusted once the seating cushions are here because we’ll be better able to gauge how long we want them then.

Loving the colours though!
Loving the colours though!

Hanging a set on the sliding door is going to be more of a challenge and will probably involve 2 taut net curtain wires, one top and one bottom, to keep the curtain from flapping when the door is opened or closed.

Also, today, we’ve started on the dreaded bathroom! All walls have been built, including the passageway wall which we hadn’t previously constructed, at we’ve begun lining them with the waterproof shower/wet room wall finish. It’s a tricky process and everything will need silicon sealant around it to make it watertight enough to shower in, but it’s going OK so far.

The shower/wet room wall finish
The shower/wet room wall finish

Tomorrow will be a super-busy day, lining the rest of the walls as well as lining the hall/passageway side of the wardrobe and bathroom with the silver finish…and routing out door holes.

Full, person-size door holes.

That’ll be fun.

Any messy!

Yay!

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s